1. WPC Decking Installation
- Install the joists: install joists on the concrete base with a spacing of no more than 35cm between two adjacent joists; use two joists at the board end with a gap of at least 5mm between them.
- Install the first board: keep a gap of at least 5mm between boards, between board ends, and between the board and the wall / objects.
- Fasten and lay: pre-drill on the joists and install the fastener, fix one clip into the side groove, then push in the next board to press the clip; alternatively slide a plastic clip into the side groove and secure with screws. Repeat until finished; where a full board does not fit, cut to the required size to finish, remembering to leave a 5mm gap.
- Edging: align the edging strip along the board edge and fix it with vertical screws.
Recommended tools: hammer, circular saw, file, spirit level and square; a carbide-tipped blade with fewer than 20 teeth is recommended.
2. WPC Decking Tiles Installation
- Cover hard ground directly, ideal for quick DIY installation.
- No nails, screws or glue required.
- Align the clips and press down gently to complete the installation.
3. WPC Wall Cladding Installation
- Mark and locate: draw a horizontal line every 40cm on the wall and mark it; make a mark 2.5cm above the intersection of the two lines as the pre-drill position.
- Drill and fix expansion tubes: drill at the marked points and fix the white expansion tubes.
- Install the joists: cut the joists, align them with the horizontal line on the wall, mark the positions parallel to the pre-drilled holes, pre-drill and fix with expansion screws.
- Install the bottom edging strip.
- Install the panels: fix the first panel to the joists, then install the remaining panels in sequence; cut to the required size where a full panel does not fit.
- Install the side and top edging strips.
4. WPC Fencing Board Installation
- Install the support steel pipes: install the steel support pipes in the ground.
- Insert the aluminium posts: insert the aluminium posts vertically and install the aluminium sealing strip.
- Install the aluminium bottom edging cover.
- Install the fencing boards one by one.
- Install the aluminium top edging cover.
- Fix: secure the posts and top edging cover with fasteners and screws.
- Install the top cap.
General tips: let the boards adapt to the installation environment for 24–48 hours before installation; wipe off dust after cutting; avoid installation in extreme heat or cold. Products last at least 15 years — proper installation ensures long-term outdoor performance.